Project information
Contribution of a 4 MW battery storage system to the frequency stability of the island power system of Melilla
October 2018 - December 2018
Funding entity Endesa Generación S.A
The aim of the project is to determine the influence of a battery storage system on the frequency stability of Melilla and in particular, of the avoided amount of shed load.
Research topics:
- Stability: Large disturbance stability, tuning of frequency loadshedding schemes, excitation control, small disturbance stability, tuning of power system stabilizers, identification of AVR and governor models
- Isolated systems: islands, microgrids, off-grid
: Islands, microgrids, off-grid
EndesaMelillaBateria2018